The pumping test project for Mpohor, KEEA, and Hemang Denkyira Districts of the Western Region are significant steps the 4Ward Development Ghana took to bring a substantial and constant flow rate of water and borehole efficiency to the Districts.
Pumping tests are vital to maintaining a pump and the high rate of water flow of the boreholes. Atlantic Hydro-Engineering Services Limited was at the site to conduct these tests successfully.
The list of beneficiary communities were:
- Mpohor Cluster 1(Kopre SDA Church Compound)
- Ayiem (Christ Apostolic Church Compound)
- Manso (CWSA Tower Area)
- Abeye (Beside the old Community Borehole)
- Ntranoa 1 (Government School Area)
- Ntranoa 2 (Community Borehole)
- Twepease (Opposite Chips Compound)
- Jukwa Bremang(Clinic)
- Frami ( Clinic Compound)
- Jukwa Krobo (Chief’s Compound)