ABOUT THE PROJECT

The Afaode community leaders, seeking a sustainable solution to their water supply issues, engaged Atlantic Hydro Engineering Services Ltd to build a Limited Mechanized Water System. The project involves several tasks, such as

1. Conducting a Geophysical Site Investigation

2. Drilling one borehole

3. Mechanizing the borehole

4. Constructing a water storage tank

5. Laying pipes and

6. Creating fetching points.

The construction is currently in progress.

PROGRESS OF WORK

The groundwork for the project commenced with the continuation of the drilling of the borehole simultaneously. The construction of the elevated concrete stand for the plastic storage tank is underway. 